Skip to product information
1 of 1

GCD

2016-2019 Cadillac ATS-V 3.25" 1350 Series Carbon Fiber Slip Shaft

2016-2019 Cadillac ATS-V 3.25" 1350 Series Carbon Fiber Slip Shaft

Regular price $1,750.00 USD
Regular price Sale price $1,750.00 USD
Sale Sold out
Shipping calculated at checkout.

Product Name: Cadillac ATS-V 3.25" 1350 Series Carbon Fiber Slip Shaft with NEAPCO Performance series U-Joints and hardware


Application:
2016 - 2019 Cadillac ATS-V: Sedan or Coupe Automatic


Product Description:


We build each 1350 series driveshaft with 3.25" carbon fiber tubing, 2024 aluminum bondable yoke shaft and spline sleeve assembly, bond yoke, adapter flange yokes, and high performance 1350 series solid cross non greaseable -joints. Hardware with lock nuts in also included. This driveshaft also includes a bushing which should be trial fit to the output shaft of the transmission. If bushing fits, install into the adapter flange with small amount of loctite. If the bushing doesn't fit on the output shaft, just simply discard. All driveshafts are high speed balanced for performance applications.

**Our 1350 series driveshaft DOES NOT
require additional adapters. We build each
driveshaft with aluminum adapter flanges.
Our driveshaft will bolt directly into your
existing OEM flanges on your transmission
and differential. This eliminates the need
for any additional parts and hardware.**
Components*:

We use 3.25" OD carbon fiber tubing from Composite Drivelines and/or NEAPCO. There are 14 layers of different directional weaves, creating a stronger, more durable tube.


• We use a 2024 aluminum bondable yoke shaft and spline sleeve assembly from Composite Drivelines for additional strength vs traditional 6061 aluminum
.
We use direct bolt in adapter flanges from Composite Drivelines and SONNAX instead of high speed CVs that require additional adapters and hardware


We use only NEAPCO Performance 1350 series solid cross non greaseable U-Joints in all of our performance and racing shafts.

Please keep heat in excess of 300 degrees away from bonded areas for extended periods of time. Please check for any clearance issues. Check the driveshaft tunnel for any bolts, heat shield rub, exhaust clearance, shifter clearance, etc. Make sure nothing rubs the driveshaft. This is your responsibility.


* Due to circumstances beyond our control, the supply chain is very broken. Back orders are unfortunately impacting all industries with extensive lead times. We will do our best to purchase all parts as listed by vendor, but from time to time other vendors may be used. If this is the case, we will give you an option to use the currently available parts, or wait until the listed parts come in. We only use the very best components in our driveshafts!

View full details

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)